A Design/Build project for a major Sports Centre which including an aquatic centre, gymnasium, four arenas, aerobic and fitness, sports shop, sports lounge bar and restaurant, parking for 500 cars. This project has been master planned as an economically viable total facility leisure centre to suit Surrey’s a growing need. It is a precedent-setting project in terms of design, financing, and business operating structure.
We and their consultants designed the Aquatic Centre as one phase of a master plan that would include a triple arena, a fitness centre, meeting rooms and a two storey fitness related office space.
The plan was developed to suit Surrey Parks and Recreation emphasis on “the most facility for the optimum cost”.
Un projet de conception / construction de centre sportif comprenant un centre de sports nautiques, un gymnase, quatre sites, un centre de conditionnement aérobique, un magasin d’articles de sport, un bar-salon sportif et un restaurant, un parking pour 500 véhicules. Le projet a été planifié comme un centre de loisirs holistique économiquement viable pour répondre à la demande croissante à Surrey. Il s’agit d’un précédent pour les structures de conception, de financement et d’exploitation commerciale.
Nous et leurs consultants avons conçu le centre aquatique comme une phase du plan directeur qui comprenait une triple scène, un centre de conditionnement physique, des salles de réunion et un espace de bureau de deux étages lié au conditionnement physique.
Le plan a été élaboré pour tenir compte de l’accent mis par Surrey sur la « construction des meilleures installations au meilleur coût ».